Western Dimensional LTD. Logo

Shiploader Installation Assistance

When a 1450 ton shiploader was scheduled to arrive in North Vancouver, Western Dimensional was given the challenge of retrieving the 100 ton lifting frame while suspended over the water. Western worked with the client to design a cantilevered lifting frame that could "catch" the lifting frame and reposition it.

Services:
  • Design of a cantilevered lifting frame supported by 26 axle lines of SPMT.
  • Fabricate. mobilize, and assemble all equipment prior to arrival of shiploader.
  • Receiving the lifting frame and repositioning.
Equipment
  • 26 axle lines of Goldhofer PST SL-E SPMTs c/w two powerpacks
  • Cantilevered beam system

Project
Gallery

© Western Dimensional LTD. | Website by mediasuite.ca